Inside. Outside. Every surface.
Painter and decorator in Christchurch. Interior and exterior painting, roofs, wallpapering, plastering, fences and decks, for homes and for the people who look after them.
- Owner operated
- Christchurch
- Part of the Parthenon family
Everything we get asked to paint.
Some of it is one wall. Some of it is a whole house and the fence around it. Pick the one that sounds like your job.
Interior Painting
Cut lines and edgesRooms, hallways, ceilings, doors and joinery. The surface gets made right first, and the work runs around the way you actually use the house.
Exterior Painting
Weatherboard, brickEvery side of a house weathers differently, and each one gets read before anything is decided. Weatherboard, brick, plaster and joinery, washed back and sealed before a coat goes near it.
Roof Painting
Fascia, spoutingLong run steel, corrugate, concrete tile and pressed metal. The moss gets dealt with rather than painted over, and the primer matters more than the colour on top of it.
Wallpapering
Paper on and offFeature walls, whole rooms, lining paper, and getting the old paper off. The wall behind is made flat and sized first, because paper shows everything you leave under it.
Plastering
Stopped flatCracks, dents, tired joins and the holes left behind by somebody else. Filled, sanded back flat, so the paint has a surface to sit on instead of something to highlight.
Fence and Deck
Stained and oiledDecks that have gone grey in the traffic lines and fences that have silvered off, taken back to grain and put under a finish that holds.
Residential Painting
You go on living in itA whole house, inside and out, run as one job. One set of dates, one person to ring, and the order worked out so the trades do not end up standing on each other.
Commercial Painting
For property managersTenancies, common areas, offices and turnarounds. Worked around the people still using the building, with the noisy and the smelly parts put where they cause the least trouble.
The same six steps, whatever the job is.
A bathroom ceiling and a full exterior are the same sequence at different sizes. Knowing it is most of what you are paying for.
It starts with us coming to look. Old paint behaves differently to bare material, and that difference is a fair number against a hopeful one. Then prep, where a job is won or lost.
Survey
We walk the job, and make our assessment
Quote
A written price built from what we found, not an estimate
Book
Agreed start and finish dates, so you can plan around it
Prep
Washed, filled, sanded and sealed before any colour goes on
Paint
Coats decided by what the surface needs, not by a set number
Finish
Furniture back, site cleaned, and a walk round together
Not sure which one it is.
Most people arrive with something they can see rather than a word for it. Describe it and we will tell you what it is and what it takes.
A job is rarely one service. A hallway repaint turns into stopping the cracks that opened last winter. An exterior turns into the fence, because doing one and not the other looks worse than doing neither.
So the eight names above are how we file the work, not how it arrives. If two or three belong to your house we quote them as one job and run them in the order that makes sense: one set of dates, one set of drop sheets, and nothing painted twice.
And if a job is not worth doing yet, we say so, with the reason and what to watch for. The naming is our problem.
Interior painting
Scuffs, marks and tired paintwork through the living areas
Exterior painting
Chalky, faded cladding and paint flaking around the joinery
Roof painting
Moss, lichen and discolouration spreading across the roof
Plastering
Cracks, dents and failed joins showing through the surface
Fence and deck
Weathering and discolouration on exposed exterior timber
The person who sees it with the walls open.
Bevan paints on Parthenon Construction sites, and Daniel Fridd runs it. A builder picks his painter once and answers for that choice in front of his own clients.
“He's one of the best painters I've seen. Perfection. Takes proper care.”
Daniel Fridd, Parthenon Construction
Finished, and photographed.
Our own photographs of our own finished work.
What people ask before they book.
The ones that come up on nearly every job, whichever of the eight it turns out to be.
Can you do more than one of these on the same job?
Yes, and usually one job rather than several.
Who actually turns up at the house?
Bevan Cochrane, who owns it, and Jordon McGregor, who is a qualified painter. The owner is on the tools, so the person you talk to is the person doing it.
Can I see something you have finished?
Yes, and it is worth doing before you ring anybody. Look at the edges and the cut lines rather than the colour, because that is where the difference between one finish and another actually lives.
How far do you go?
Christchurch. Far enough out that most of the city is in, close enough that nobody spends an hour of your job in a van.
How much notice do you need?
It depends on the time of year, and exteriors book further out because they wait on the weather. Ring and ask rather than guessing. If the honest answer is that you are waiting, we say so.
Will you tell me if it is not worth doing?
Yes. A fence past a coat is money better spent on the boards, and we would rather say so than put our name on a job that fails.
What about insurance repairs?
A share of the work is repairing damage in people's houses after a claim, and some of it reaches us through Parthenon Construction. Different way in, same standard out. If an assessor has sent you here, say so and we handle the paperwork side with the rest of it.
Tell us which one it is.
Or describe what you can see. The site visit is the quote: ten minutes at the house tells us more than a week of emails.
- 022 615 5816
Bevan, direct
- bevan@prd.kiwi
Email
Christchurch
Where we work