Skip to main content
Parthenon Restoration & Decorating

Washed back. Sealed. Then colour.

Exterior painting across Christchurch. Weatherboard, brick, plaster and joinery, washed back and sealed before a coat goes near it, so the finish holds instead of lifting at the corners.

  • Owner operated
  • Christchurch
  • Part of the Parthenon family

The house has been telling you for a while.

Chalk on your hand when you lean on the weatherboards. A sill gone soft at the corner. Green on the boards behind the hedge. None urgent, all of it the clock running.

Exterior paint fails from underneath: water finds a joint, an end grain or a nail hole, the coating loses its grip, and the failure spreads sideways. By the time you see it peeling it has been happening for two winters. Which is why the price sits in the preparation.

What we cover is the outside of the building. Weatherboard, brick, plaster and fibre cement cladding. Joinery, window reveals and sills. Soffits, fascia and barge boards. Garage doors, front doors, gates, and the fence if it belongs to the same look.

Where timber is bare we seal it first. Where a board has gone past a coat we say so at the quote rather than painting over it.

How a job runs
  • The cladding

    Weatherboard, brick, plaster, cement board

  • The joinery

    Windows, reveals, sills and doors

  • The edges

    Soffits, fascia and barge boards

  • Rot and soft timber

    Said out loud, not painted over

Nothing goes on a dirty wall.

Four things decide how long an exterior lasts, and every one of them happens before the first coat goes on.

We wash it first. Not hose it, wash it, at a pressure the cladding can take: high enough to take the chalk and dirt off, low enough not to drive water behind the boards. Moss, mould and lichen we treat and leave to work rather than blasting, because blasting leaves the root and it comes back through the new coat.

Then we scrape and sand wherever the old coating has lost its grip. Every edge left behind is feathered back so it does not read as a ridge.

Then every bare surface is sealed and every gap dealt with. Bare timber, filler and fibre cement all drink a coat at different rates. Joints that have opened get something that stays flexible, because a hard filler in a moving joint cracks by the second summer.

Then, and only then, colour. Coats considered rather than counted: a sound sealed surface takes fewer than a colour change, and they go on at the spread rate the product asks for.

The questions people ask
  • One

    Washed at a pressure the cladding takes

  • Two

    Moss and lichen treated, not blasted

  • Three

    Scraped, sanded, edges feathered back

  • Four

    Bare surfaces sealed, joints made good

  • Only then

    Laid on, never stretched out

Every side of a house is a different job.

Four walls, four climates, four rates of failure. Quoting a house as one number is how three sides get more than they need and one gets less.

The north side

Sun, heat and chalk

Takes the most sun, so it fades and chalks first, and dark colours here move the most. It looks fine from the street until you run a hand down it and it comes away powdery.

The south side

Damp, moss, lichen

Never really dries out. This is where the green comes back, the lichen digs in, and a coat lifts at the joints first. We spend the extra time on it even though it is the wall nobody looks at.

The west side

Afternoon sun

Takes the afternoon heat and most of the driving rain. Harder on a finish than either alone, because the surface is wet and then baked in the same day.

The east side

Morning damp

The gentlest of the four, and usually still sound when the others are ready. Worth knowing, because it changes the cost when only two elevations need the full treatment.

The warmer months.

Exterior work, Christchurch

An exterior needs a dry surface and enough warmth to form a proper film, and both are a season rather than a week. Here is the year, with the warmer stretch shaded.

What happens on the visit
The upper storey of a house in dark charcoal weatherboard against cloud, white joinery cut in clean at the window

Charcoal weatherboard.

Weatherboard and joinery

The line to look at is where the boards meet the white joinery. Cut in by hand, one board at a time, and it is what separates an exterior that reads as finished from one that reads as covered.

View the full portfolio

What people ask about the outside.

The ones that come up on nearly every exterior, including the awkward one about rot.

  • Does it have to be washed first?

    Yes. Chalk, dirt and salt stop a coating gripping, so paint over an unwashed surface and the film sits on the dirt rather than the house. The cheapest step to skip and the most expensive one to have skipped.

  • How long does an exterior take?

    It depends on the height, the access and how much scraping the walls need, so dates come off the lap of the house rather than a table. Weather moves them, and when it does you hear the same morning.

  • Do I need scaffolding?

    Single storey is usually ladders and a trestle. Two storey almost always needs scaffold, quoted as its own line because it is a real cost.

  • Will you use a sprayer or a brush?

    Both, in different places. Spraying lays a better film on a big flat run of cladding and it is faster. Joinery, edges and anything next to a window is cut in by hand.

  • How long will the paint last?

    Longer on the sheltered elevations than on the north and west, which take the sun. What shortens it is never the number of coats, it is whether the surface underneath was sound, dry and sealed.

  • What about the garden?

    We tie plants back or cover them rather than trampling them, and anything that has to be cut we agree first. Drop sheets go over paths and decks, and the wash water stays off anything that will not take it.

  • What if there is rot?

    You hear at the quote if it is visible, and the day it turns up if it is not. Soft timber does not hold paint, so painting it only hides the repair. Small sections we cut out and replace; anything structural is a builder rather than a painter.

  • When should I ring?

    Earlier than feels necessary. Exteriors wait on the weather and everybody asks in the same few weeks once it turns, so a winter quote for spring work is the best planning there is.

More questions

The verdict that is not ours to give.

An exterior is judged two winters later rather than on the last afternoon. Bevan is the painter Parthenon Construction puts on its own houses, and the man who runs it says this.

“He's one of the best painters I've seen. Perfection. Takes proper care.”

Daniel Fridd, Parthenon Construction

Who you get

Get it looked at before the season.

We walk the house and read all four sides, which tells us more than a photograph: which elevations are gone, which are sound, and whether the job is this season or next.

Or ring 022 615 5816. There is no obligation either way and nobody will chase you.