Cut in by hand. Left clean.
Interior painting across Christchurch. Rooms, hallways, ceilings, doors and joinery, with the surface made right before a lid comes off and the work run around the way you use the house.
- Owner operated
- Christchurch
- Part of the Parthenon family
The room you stopped looking at.
You stop noticing the marks for two years, and then one afternoon you see nothing else.
Usually it is a hallway, which takes every bag, every shoulder and every set of small hands in the house and shows all of it in one strip of wall at waist height. Sometimes a ceiling gone a different white to the one it started as. Sometimes a whole house, because you have just bought it and there is nothing in it yet.
What we cover is the inside of the building: walls, ceilings, hallways and stairwells, doors and frames, skirting, architraves, window reveals, kitchen and bathroom joinery, and the cupboards nobody mentions until the room around them is fresh. Where a wall needs stopping first, we do that rather than fill over it.
We plan the work around the house being lived in rather than emptied. If it will be empty for a stretch, say so and we run it that way. And a hallway is rarely just a hallway: doing it in one go costs less than three.
The rooms
Walls, ceilings, halls and stairwells
The trim
Doors, frames, skirting, architraves
The joinery
Kitchen and bathroom cabinetry
While you live in it
Furniture moved back the same day
Four surfaces, four different jobs.
A ceiling, a skirting board and a cupboard door are three different products and three different methods.
Walls and ceilings
Rolled, cut and laid offFlat, even, and cut in by hand where they meet. A ceiling shows every roller mark because it is lit from its own plane, so it is laid off in one direction, wet edge to wet edge.
Doors and trim
Brushed or sprayedTrim takes an enamel rather than a wall paint, because it is the surface people touch and it has to stand being wiped down. Doors come off their hinges onto trestles where the finish justifies it.
Kitchens and baths
Where steam collectsThese two rooms defeat ordinary paint. Grease comes off before anything goes on, and the product is made for a room that fills with water twice a day. Miss either and it peels above the shower.
Stairwells and voids
Access, edges and heightThe ones nobody wants. A double height stairwell is a scaffold problem before it is a painting problem, and the reason those walls stay scuffed for years is that reaching them safely is most of the work.
Filled, sanded, sealed. Then colour.
Inside a lived-in house the prep is everything in the room that is not the wall, and that is the half a finished photograph never shows.
Furniture out or into the middle and covered. Floors protected rather than sheeted with something that slides. Hardware off rather than cut around, into a labelled bag, back on at the end.
Then the surface. Washed where it is greasy, filled where it is dented, sanded back flat rather than until it looks flat. Every repair and bare patch sealed, because plasterboard and filler drink paint at different rates.
Then dust, which is what people remember. We sand with extraction where the room allows, and wipe the room down before anything is opened, because a fleck of grit in a wet wall is permanent.
And each evening it goes back to being a house. Tools out of the hallway, sheets folded, and a floor you can walk on in socks.
First
Furniture out, floors protected
Then
Hardware off, into a labelled bag
Then
Washed, filled, sanded back flat
Then
Every repair and bare patch sealed
Only then
Swept down before a lid comes off
What is actually under the finish.
Only the top layer is visible once we leave. This is the order the rest of it goes on in, from the wall outwards.
What is actually there
Old paint behaves differently to bare material, and that difference is a fair number against a hopeful one. We look before we quote.
Washed
Nothing holds to a wall that has a kitchen on it.
Filled and sanded back flat
The boring half, and where a job is won or lost.
Sealed
Every repair and bare patch sealed, or the coats above soak in unevenly and the patch reads through the finish in the right light.
Coats
Considered, not counted. The wall decides that rather than a quote does.
You are living in it while we are in it.
The fear is almost never the finish. It is the days in between: strangers in the house, the good rug, the dog getting out, and nobody to ask.
It is Bevan Cochrane, who owns it, and Jordon McGregor, who is a qualified painter. The person who quoted the job is the person doing it.
We do not treat the house as a site. No front door propped open all afternoon, no radio, shoes off past the hallway, and doors shut behind us if you have a dog or a small child.
The last hour decides how it feels: hardware back on, furniture back where it was, floors clear, rubbish gone. Not tidied. Put back. And if something needs sorting afterwards, the person who did it comes back.
Owner/Operator
Bevan Cochrane, on the tools
Qualified Painter
Jordon McGregor, alongside him
How it is staged
One or two rooms at a time
The last hour
Put back, not just tidied
A raked ceiling, finished.
Interior painting, ChristchurchTwo frames of the same room, which is enough. A raked plane is lit along its own surface, so it shows every join, every lap mark and every place a wet edge was allowed to go off.
View the full portfolioThe ones people ask inside the house.
Answered plainly, including the ones that usually get a shrug.
How long will you be in the house?
It depends on the number of rooms, how much trim there is, and how much stopping the walls need, so the honest answer comes off the walk through. Either way you get dates before it starts and a call if they move.
Do I have to move out?
No. We run most jobs around you, one or two rooms at a time, with the kitchen working and the beds back where they belong each evening.
How much furniture do I need to move?
The small and the breakable, and anything you would rather nobody else handled. Everything else goes into the middle of the room, covered, and back the same day. If a wall unit has to come off, we agree that beforehand.
Is two coats always enough?
Not always. Two is normal over a sound, sealed, similar colour. Dark to white, or a patchy repair, can take three. What is under it decides, and we work that out at the quote.
Can you paint over wallpaper?
Sometimes, and usually a false economy. If the paper is sound, well stuck and not textured, we can seal and paint it. If it is lifting anywhere it will lift further once wet, and then you are stripping it with paint on it, which is worse than stripping it now.
What about the smell?
Most interior work is waterborne now, so it is mild and gone in a day. Where an enamel is right for trim it will be stronger, so those rooms are ordered to air out before you need them back.
When is the cheapest time to do it?
While the house is empty. Between tenants, between owners, or before you move in. No furniture to move, nobody to work around, every surface reachable. If that window exists, use it.
What usually comes with it.
Interior jobs rarely arrive alone, and these four are worth doing while the gear is already in the house.
Plastering
Stopped flatWe make cracks, dents and tired joins good before anything is painted, so the wall is flat rather than filled.
Wallpapering
One wall or allWe hang it straight, with the wall behind it made flat and sized first, or take it off so the room can be painted instead.
Residential Painting
Inside and out, one jobThe whole house run as one job, with one set of dates and one person answering for all of it.
Exterior Painting
The other four sidesThe outside of the same house, quoted together so the scaffold and the setting up are paid for once.
The finish, judged from a metre away.
Interior work is looked at closely, in daylight, by the people who live with it. Bevan paints inside the houses Parthenon Construction builds, and this is what Daniel Fridd makes of it.
“He's one of the best painters I've seen. Perfection. Takes proper care.”
Daniel Fridd, Parthenon Construction
Show us the room.
The room you keep walking past is the one to start with. We walk it before there is a number, because ten minutes in the hallway says more than a week of email.
- 022 615 5816
Bevan, direct
- bevan@prd.kiwi
Email
Christchurch
Where we work